For this observatory, we supplied the instruments and we installed the roll-off observatory after treating the wood.
PROCUREMENT: All the components of this observatory were already in stock and ready to be installed. This is one of our strengths, having a large stock of any kind of telescopes, accessories, cameras, mounts as well as entire observatories.
DRAWING: to maximise the height of the pier and therefore have access to objects just above the horizon, we use CAD to check how high the telescope could go before touching the roof. With the configuration that we designed, the telescope needed to be parked horizontally but it has the advantage to point objects as low as 5°-15°.
WOOD PRE-TREATMENT: the Greenline observatory are made of untreated pine wood. The manufacturer Dome Parts ships their observatory all across the globe where treatment requirements could differ. We use our warehouse space to treat all parts of the observatory using oil based wood preservative.
INSTALLATION: once the concrete slab was ready, we delivered the observatory and installed it. It took just one day to assemble the observatory, bolting down the pier, installing the mount and the tube.